Home -> District Announcements

Amy Higgins

Crews on the site of the new Elyria High School are building the structure for the second story of the new academic building and athletic complex. Pre-cast concrete slabs are being installed for the second floor of both units. The new academic building (Unit G), south of the Washington Building, is bordered by Middle and West Avenues and Seventh Street. The Athletic complex, north of the Washington Building, is bordered by Middle and West Avenues and Fifth Street.

Meanwhile, concrete walls continue to go up in other academic areas(Units D and F) and the auditorium (Unit E). Crews also are continuing their work installing electrical and plumbing lines in the masonry walls.

Attached are aerial views of the academic and athletic buildings taken from time-lapse cameras mounted on the Washington building.

Also attached: Design schematic showing EHS units for construction. First floor plan detailing classrooms in each unit.

Unit G-i-beam.jpg
Unit G-i-beam.jpg
athletic building-ibeam.jpg
athletic building-ibeam.jpg
EHS Cnstrctn Unit Desigs 2_11_09.pdf
EHS Cnstrctn Unit Desigs 2_11_09.pdf
First Floor Plan Feb 2009.pdf
First Floor Plan Feb 2009.pdf

Keyword(s):


Enter your e-mail address to receive updates from Elyria Schools.

2/20 President's Day
2/21 MARDI GRAS - FAT TUESDAY
3/29 End of 3rd Grading Period
3/30 Inservice/Records Day
4/5 Conference Make-up Day
4/6 Spring Break Begins
4/16 Spring Break Ends

VIEW FULL CALENDAR

2011-2012 Dress Code Fashion Show

Remember This? EHS Vs. EC Game Highlights


VIEW ALL VIDEOS